SURVEYED PAVEMENT DISTRESS IN CABRERA STREET
Defect(s)/Deficiencies Estimated Quantity Unit of Measure Remarks Length Width Depth No. of Slab Latitude Longitude
Total: 40
Major Scaling 27.9 sq. m 2.5 cm 5 13.87462 120.9135
Transverse Crack 3 l.m 3m 6cm 2.3 cm 6 13.87447 120.9137
Transverse Crack 3 l.m 3m 6 cm 2 cm 8 13.87462 120.9136
Potholes and Ravelling 0.231 sq. m 42 cm 55 cm 7.5 cm 24 13.8746 120.9144
Cabrera St/E 40 13.87462 120.9147
Note: Legend: /E - End
1. The data is surveyed last February 17, 2022.
2. The unit of measure l.m denotes linear meter.